Guest Room – New Ceiling

By now, you know one of our favorite things is starting a new project before the other is complete. So it should come as no surprise that we are moving on from the bathroom a bit early.

So bringing it way back, the first project we worked on when we first moved in to this house was the Guest Bedroom located in the back of the house. Here is a quick trip down memory lane:

Day 1 – Move in Day (minus the furniture)!

ISlig3vqypi87h0000000000

Original Space – from the Zillow ListingĀ 

Sept 2016 – First Finished Room in the House!

img_1131

img_1129

It was looking pretty good and worked really well for guests, but we needed to finish the ceiling.

When we first ripped out the old plaster ceiling and exposed the wooden beams, I was feeling exited about the character it added. But, as we started to finish the rest of the rooms in the house, I just loved how clean and fresh they looked with nice bright white ceiling.

In addition to the dark, semi-scary ceiling, there was no overhead light in this room. The lamp in the corner was the only source of lighting, which made the dark room, even darker.

So we figured we would swing back around to this room once the bathroom was complete.

To start, Collin spent a day off framing out the ceiling with 2×4’s. The walls in this room are plaster still, so he had to chip away at some weak areas to install the wall beams, but eventually got everything up:

IMG_1123

Next step was to install lighting. This room had a switch on the wall already that controlled that outlet seen in the above picture. The goal was to have that outlet always “hot” or on, and the switch to now control the ceiling light.

First we installed the electrical box in the ceiling beams, and ran some wire through the box:

IMG_1235

We ran the wire down the wall to the switch. Once the wires were all connected and taped up, Collin and I tested the light fixture and it worked!

We ended up removing the light fixture to allow for the drywall installation.

We only had 2 full pieces of drywall left in our stash, so Collin and I installed those in the room, and then used some scrap drywall to patch in two areas (in green board).

IMG_1240

IMG_1241

We ran out of drywall on the last 2 pieces, of course:

IMG_1242

Collin is going to try to get those last two pieces up and the first coat of Spackle on this week/weekend.

Since this room is mostly done (aside from the ceiling), this project should go quickly. Just some sanding/patching and a coat of paint. We do need to spruce up the closet in this room next, but I am not looking forward to that project so I’ll keep trying to ignore it for now.

Bathroom Detail Work

So it turns out that once your bathroom is to a point of functioning, like, you can shower and use the toilet, you have very little motivation to actually finish said bathroom.

Life has been a little crazy around here. We have been home maybe 2 weekends out of the last 6 or 7. Lots of exciting stuff happening, but we haven’t touched a tool or paint brush in weeks.

But we need to get moving on getting this to-do list to-done, so were back with progress updates and plans moving forward.

Last we left off, we had the following outstanding details that needed to be completed in the bathroom:

  • Install Shower Glass
  • Finish Shiplap Wall/Re-Center Light fixtures
  • Tile back of the shower curb
  • Baseboard and Door Moulding
  • Paint the Window and Surround
  • Art

Shockingly, we have finished 3 out of 6 items!

  1. Install Shower Glass doors and Shelves:

I ordered our new shower doors from here. It was a pretty big risk getting glass panels shipped, but the warranty was good, so I took the chance. They both came in perfect condition.

To install, we used a tile drill bit to drill 2 holes in to the tile walls. The door company sent an anchor and screw and we screwed in the mounting piece. Then we slide in the glass, and tightened the mounting screw. We finished it all of with a bead of clear caulk all around the edges.

The corner shelves are the same process, pre-drill the holes with a tile drill bit, insert anchor and screw in mounting bracket.

Honestly, I was really scared about these, specifically, drilling in to our brand new tile, but it went pretty seamlessly and looks super professional.

IMG_1229

2. Finish Shiplap Wall and Re-Center Light Fixtures:

When I initially installed the lighting for the shiplap wall, I centered it off of the center of the wall. Then the vanity got installed and I realized they were not centered over the sinks <– Whoops!

So I had to remove the top 3 boards of shiplap, move the lighting and electrical to the correct locations, re-cut new shiplap, and reinstall the shiplap and the light fixtures.

To finish off the wall, I installed 1/4 Round moulding around the edges and caulked and painted everything to match the walls.

IMG_1246

3. Art:

We needed some art to tie the two sides of the bathroom together. There is a color palette of light pinks and some blue accents in the rug, so I wanted to bring some color above the toilet area, next to the shower.

I picked up this art from Minted. I ordered it online, not framed and grabbed a nice big frame from Target.

The wood from the frame goes with the mirror and the colors match the rugs perfectly!

IMG_1249

Updated to-do list:

  • Install Shower Glass
  • Finish Shiplap Wall/Re-Center Light fixtures
  • Tile back of the shower curb
  • Baseboard and Door Moulding
  • Paint the Window and Surround
  • Art

We are currently working on finishing the bathroom and installing a ceiling in the back guest room at the same time, so the next few posts will likely flip flop between the two rooms.